BIKANER BYPASS PROJECT

Client
owner
CONSULTANT
STRUCTURE
Duration

Project Overview

TO SUBGRADE TOP CONSTRUCTION WITH DRAWING, DESIGN, CASTING, ERECTION ETC. (36500 SQM)